Marine Link
Friday, September 18, 2026

Barge Master T700 to Be Installed on Boskalis Ndeavor

Maritime Activity Reports, Inc.

December 22, 2014

  • BM-t700 arrives in Singapore (Photo: Barge Master)
  • Boskalis Ndeavor (Photo: Boskalis)
  • BM-t700 arrives in Singapore (Photo: Barge Master) BM-t700 arrives in Singapore (Photo: Barge Master)
  • Boskalis Ndeavor (Photo: Boskalis) Boskalis Ndeavor (Photo: Boskalis)
A Barge Master BM-T700 system was unloaded in Singapore today as it awaits the early 2015 arrival of DP-2 multipurpose vessel Boskalis Ndeavor.
 
According to Barge Master, the T700 will be mobilized on the Ndeavor and continue to the Phillipines where a bridge will be installed between two gas platforms using the Barge Master to compensate the motions of the bridge as a result of the waves.
 
Built by Samsung C&T corporation ZPMC - Shanghai Zhenhua Heavy Industries Co.Ltd in 2013, the diesel-electric Ndeavor is equipped with a helicopter deck and can be outfitted for cable-laying or a range of other tasks, including diving support, subsea rock installation, offshore construction support, salvage assignments and dredging.
 
At 7,500 DWT, Ndeavor has a length of 99 meters, a breadth of 30 meters and a design draught of 4.7 meters. A six point mooring system is part of the standard outfitting of the vessel.
With the advent of fuel transition, digitalization, AI and autonomy, innovation in vessel design and operation proceeds at unprecedented speed.
Read the Magazine

Ascendant China Boosts Vehicle Trades

Shipyard in Focus

Subscribe for
Maritime Reporter E-News

Maritime Reporter E-News is the maritime industry's largest circulation and most authoritative ENews Service, delivered to your Email five times per week